Project Information
Dam DOUIMIS
Execution of construction works on the Douimis dam in the governorate of Bizerte with the foundation in get grouting as waterproofing of the dam, A dam which is intended mainly for the distribution of drinking water including 2500000m3 of embankment, 350000m3 riprap, 50000m3 of concrete
(Flood spillway, Gallery, Intake tower...)