Saida Dam

Project Information

Saida Dam

The Saida reservoir dam project, located in the governorate of Mannouba, was designed to provide a reliable source of water for irrigation and domestic consumption in the surrounding region. The dam was built using a flexible concrete diaphragm wall technique over a length of 1,400 meters to ensure complete waterproofing. The Saida reservoir dam also includes a large volume of fill of 2500,000m3 to stabilize the structure and a quantity of concrete of 30,000m3 for finishing works. The construction was carried out in compliance with the highest quality and safety standards to ensure the durability of the work.

Dam DOUIMIS

Project Information

Dam DOUIMIS

Execution of construction works on the Douimis dam in the governorate of Bizerte with the foundation in get grouting as waterproofing of the dam, A dam which is intended mainly for the distribution of drinking water including 2500000m3 of embankment, 350000m3 riprap, 50000m3 of concrete (Flood spillway, Gallery, Intake tower...)

Barrage Kalaa Kebira

Project Information

Barrage Kalaa Kebira

The project consists of the construction of a reservoir dam in Kalaa Kebira in the governorate of Sousse. The watertightness of this dam will be ensured by a flexible concrete molded wall of linear 1100. The dam will have a storage capacity of 2000,000 m3 of backfill and will require 300,000 m3 of riprap.